Diligence is a project plan, not an email thread.

Most vendor reviews die of drift. Requests go out one at a time, answers land in different inboxes, and nobody can say what is still open. Structure it instead: pre-qualify from public material, then run a small number of named workstreams with owners, artifacts and criteria for finishing.

01

Pre-qualify from what is already public

You should be able to eliminate most of a longlist without signing anything. If a vendor makes you sign paperwork to learn what their product does, how it is built and roughly what it costs, that is a signal about how the rest of the relationship will feel. Read first, then spend your legal time on the shortlist.

  • The architecture in plain terms: what is one system, and what is stitched together.
  • Coverage for your setting and your specialty, described specifically enough to disagree with.
  • Pricing shape and the security posture summary — enough to shortlist honestly.
  • Whether the vendor publishes the limits of their own evidence. The good ones do.
02

Then run four workstreams, with named owners

Four is enough. Each gets one owner on your side, one on the vendor’s, a list of artifacts, and a date for the next checkpoint. Anything that does not belong to a workstream is not diligence — it is curiosity, and it can wait.

  • Security and controls: questionnaire, evidence package, validation of the answers.
  • Commercial: the agreement, the support model, the terms your counsel cares about.
  • Delivery: migration and rollout scope for your actual sites and your actual data.
  • Workflow proof: your own people running your own scenarios in the real product.
03

Set go/no-go criteria before you start asking

Decide in advance what would end a workstream in the vendor’s favor and what would end it in yours. Written first, these criteria protect you from the two failure modes of long evaluations: the sunk-cost drift towards whoever you have spent the most time with, and the reopened question that stalls signature for another month.

  • One sentence per workstream: what has to be true to pass.
  • The evidence that satisfies it, named as an artifact rather than a feeling.
  • Who signs it off, and who can overrule them.
  • What a fail means — eliminate, escalate, or accept with a documented risk.
04

Keep one open-items list until signature

One list, visible to both sides, with an owner and a date on every line. It is unglamorous and it is the single highest-leverage thing in a vendor review, because it makes the moment of decision honest: you sign knowing exactly what is unresolved, or you do not sign.

  • Every outstanding request, with an owner on both sides and a due date.
  • Anything answered verbally but not yet in writing — that gap is where disputes live.
  • Every risk you agreed to accept, recorded as accepted rather than forgotten.
  • A final read-through of the list in the meeting where you decide.
Bring your checklist

We will work to your process, not ours.

Send the questionnaire, the artifact list and your criteria. We will put names and dates against every line and tell you where we cannot meet a bar.