Skip to main content
Evaluate · Pricing and budgeting

Budget the whole move, not the license.

The number that gets approved is rarely the number that gets spent, because the license is the easy part to quote and the project is the part that surprises people. Split them, name the assumptions that would change either one, and put the cost of standing still on the same page. That is a budget a board can approve without flinching later.

01

Separate the platform from the project

Two different budgets, two different owners, two different risk profiles. The platform is a recurring line you can forecast. The project — migration, interfaces, configuration, training — is one-off, front-loaded, and the part that moves when scope moves. Quoting them together hides exactly the thing you need to watch.

  • The recurring platform cost, and what drives it up or down as you grow.
  • One-off migration effort, sized against how much history has to come across.
  • Interface and configuration work, priced per connection rather than as a lump.
  • Training and go-live support, including the cover you need for the staff who are in the room learning.
02

Name the assumptions that change the number

Every quote rests on assumptions somebody made quietly. Drag them into the open and write them down next to the price, so a change in scope produces a conversation instead of an invoice. If a vendor cannot tell you what would move their number, they have not scoped the work.

  • How many locations, and whether they go live together or in sequence.
  • How much clinical and billing history moves, and how far back.
  • How many outside connections, and how many are new builds.
  • How much configuration differs by site or by specialty.
  • What the old contract still costs you while both systems run.
03

Put the cost of standing still on the same page

Comparing a new system against zero is the most common mistake in this process, and it always favors the system you already have. Staying put has a price: the hours your staff spend moving information between screens, the revenue that leaks through work nobody has time to chase, the support contracts on tools that barely talk. You do not need a study to price this — your own team can estimate it in an afternoon, and it belongs in the comparison.

  • Staff hours spent re-keying the same information into more than one system.
  • Work that gets dropped because nobody has capacity to chase it.
  • What you pay today, across every vendor, support line and add-on.
  • The cost of a decision deferred another year, at your current rate of growth.
04

Before you take it to the board

Four checks. If all four are documented, the approval conversation is about strategy rather than arithmetic.

  • Platform cost and project cost are separate lines with separate owners.
  • Every assumption that would materially change scope is written down and agreed.
  • The support model you are buying is named, and its cost is in the number.
  • The comparison includes doing nothing, priced as honestly as the alternatives.
Bring your checklist

Get a number you can defend.

Give us your locations, your history and your connection list, and we will come back with a range and the assumptions behind it.