Pressure-test the move before you sign.
Implementation is where good software goes wrong. The product you saw in the demo is not the thing that will hurt you — the thing that will hurt you is a migration nobody scoped, a cutover nobody owns, and a training plan that arrives after go-live. All of that is knowable before you commit, if you ask for it in writing.
What a real implementation plan contains
Ask for the plan as a document, not a reassurance. A serious one covers four things, and it is specific about each: what happens in discovery, what moves and in what order, how the interfaces get built and checked, and who trains your staff on which days. If any of the four is missing, you are being sold optimism.
- Discovery of how you work today, including the workarounds your team invented.
- A migration order, staged by module and by location.
- Interface build with named validation checkpoints, not a single “integration” line item.
- Training and go-live support, assigned by role — front desk, clinicians, billing, management.
Ask what moves first, and what is deliberately left behind
Every migration leaves something behind. The difference between a good vendor and a bad one is whether they tell you what, on purpose, before the move. Get the list of what comes across and the list of what does not, and make sure the second list is a decision you made rather than a surprise you discovered.
- Patients and their full clinical history — not a contact export.
- Insurance coverages, so nobody re-enters plans on the first busy morning.
- Billing history and outstanding balances. If the money does not move, you will run two systems for a year.
- Scanned documents and images, attached to the right patient.
- And in writing: what is being left in the old system, and how you will reach it if you need it.
How duplicates and bad data get handled
Every old system holds the same patient twice — a maiden name, a typo, a walk-in entered in a hurry. This is where migrations quietly go wrong, and “our tool handles it” is not an answer. Ask to see the matching rules, and ask what happens to the records the rules cannot decide.
- Ask for the matching logic as steps, not as a claim about accuracy.
- Ask where uncertain matches go, and who reviews them — it should be a person on your team.
- Confirm that nothing is merged silently, and that every match is recorded.
- Ask how counts are verified at each stage, so nothing goes missing without anyone noticing.
Rollback is a fair question, not an insult
A vendor who is offended by the word rollback has not run enough go-lives. You are asking about boundaries and ownership: if a location goes badly on Tuesday, what specifically can be reversed, who decides, and who is on the phone. Get names and thresholds, not sentiment.
- Define rollback boundaries per stage — what can be reversed, and up to what point.
- Name the cutover owner for each workstream, on both sides.
- Agree the escalation path and the response you can expect during go-live week.
- Set the checkpoints that must pass before the next location starts.
Be suspicious of a timeline offered before discovery
A date quoted before anyone has looked at your data is a sales artifact. It is fair to ask what the stages are, what has to be true before each one starts, and what typically causes a stage to slip. It is not fair to either side to fix a go-live date on a guess — and a vendor who fixes one anyway has told you how the project will be run.
- Ask for the stages and their entry conditions, not a single end date.
- Ask what has slipped on other projects, and why. The honest answer is specific.
- Agree how a slipped stage is communicated, and to whom.
- Keep your own internal deadlines separate from the vendor plan until discovery is finished.